Week 8

Week 8

This week our final report was made as the deliverable for this project we edited the 16-page paper down to 8 to fit constraints. It was very difficult as much of the information was pertinent to the water reduction system, but had to be removed. After completing our paper we started to work on our final presentation using google slides.


A 3D- model of the roof also continued to be worked on to display the lotus rainwater system and green roof.

A final count of water saved and collected was also.

Comments

Popular posts from this blog

Week 3 Blog Post

Week 2 Blog Post